cisco certification 200-125 ccna exam preparation with practice questions and Answers
A router has one static route to each destination network. Which two scenarios would require an administrator to alter the static routes that are configured on that router? (Choose two.)
The destination network no longer exists.
The destination network is moved to a different interface on the same router.
The path between the source and destination is upgraded with a higher bandwidth link.
A topology change occurs where the existing next-hop address or exit interface is not accessible.
The remote destination network interface has to be down for 15 minutes of maintenance.
Popular Posts
-
It will drop the frame. It will send the frame back to host A.
-
core layer distribution layer access layer entry layer
-
source and destination MAC source and destination application protocol source and destination port number source and destination IP a...
-
The destination networks do not exist. The IP addresses on the router interfaces must be configured as network addresses and not host a...
-
physical, network, application, data link, presentation, session, transport application, physical, session, transport, network, data link...
-
POST code the routing table the running-configuration the start-up configuration the bootstrap instructions a copy of the operating sys...
-
15 hops 16 hops 100 hops 120 hops 255 hops
-
Application Layer Data Link Layer Network Layer Transport Layer